Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

explain what a directed line segment is and describe how you would find the coordinates of Point P along the directed line segment a b that partitions so that t
Solve the inequality -8<3y-20<52
Which of the following elements is most likely to form a +1 charge?ClMgNaLi
Complete the table by filling in the missing information Name Variables Constants Equation Boyle's law PV =k C volume, temperature pressure, moles of gas volume
After the discussion, what does the author of "On Writing Well" feel the students have learned about writing? O A. That everyone writes differently and there i
an aquarium, initially containing 60 gallons of water, is being drained for cleaning. After minutes the amount of water that has been drained from thevtank is 4
why is it so important to record all the data in a science experiment​
Estimate the quantity of soil to be excavated from the borrow pit​
Which of the following is true ?
Which of the following statements best explains why producers conduct market research?