carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

How has light been described? A. as both a wave and a particle B. as neither a wave nor a particle C. as only a wave D. as only a particle
human rights,inclusivity and environmental issues
what is one thing that women in Sparta could never do
Which ordered pair is a solution of linear equation shown in the graph above?
But scarcely had that island faded in blue air than I saw smoke and white water, with sound of waves in tumult– a sound the men heard, and it terrified them. –
How is a habitat like a persons address and a niche is like a person's job?
gracie uses 10 beads on each necklaces she makes. she has 60 beads to use. how many necklaces can Gracie make?
Help! What are the measures of angles A-G?!
what is the purpose of the bacteria in the colon?
how to fill in the table and find the rule