savalliejoycehtwi savalliejoycehtwi
  • 04-05-2017
  • Business
contestada

A _____ refers to a control system combining four sets of performance measures: financial, customer, business process, and learning and growth

Respuesta :

ChrissyR
ChrissyR ChrissyR
  • 04-05-2017
The answer is balanced scorecard
Answer Link

Otras preguntas

A 10-KG cart moving at 5 m/s collides with a 5 KG cart at rest and causes it to move 10 m/s. Which principal explains the result?
You volunteer for chalkboard cleaning duty and you get to work with the erasers. As you rub the dust off of the chalkboard, white chalk dust enters the air and
PLZ ASAP help meee I need u nowww
When an Arrhenius acid is in solution, what does it do?
Suppose the corporate tax rate is 40 %40%. Consider a firm that earns $ 2 comma 500$2,500 before interest and taxes each year with no risk. The​ firm's capital
Suppose that the mean time for a certain car to go from 0 to 60 miles per hour was 7.7 seconds. Suppose that you want to test the claim that the average time to
A person draws a card from a hat. Each card is one color with the following probabilities of being drawn: 1/10 for red, 1/5 for blue, 1/20 for black, and 1/5 fo
WILL GIVE BRAINLIEST, please explain your answer! Calculate the area of the block "V" shown below. *Drawing not to scale
Who believed in an Executive Brach that has the responsibility to enforce the law.
GEO, TRIGONOMETRY! 45 POINTS AND BRAINLIEST FOR CORRECT ANSWER. NEED HELP ASAP PLEASE :) Isabell is standing at the top of a waterslide that leads to a pool bel