n5opopUtratiii n5opopUtratiii
  • 02-05-2017
  • History
contestada

When one party to a contract fails to perform as promised, it is called
a. bad faith.
b. liquidated damages.
c. breach.
d. litigation?

Respuesta :

Crazyanimegirl
Crazyanimegirl Crazyanimegirl
  • 02-05-2017
C.Breach   hope this help (:
Answer Link

Otras preguntas

What is the numerator or denominator of 4/5
When was World War I?
If the speed of an object is tripled, its kinetic energy will be
A 1 digit number and a 3 digit number have a sum of 205.  The same two number have a difference of 195, a product of 1,000 and a quotient of 40.  What are the t
You have a cylinder with a diameter of 15 inches and a height of 12 inches. What is the volume of the largest sphere thg will fit inside it? If you can will you
Solving systems by elimination: 2x + 4y = -4 3x + 5y = -3 Please show me your work so I can do the rest myself. Thanks!
How is the numeral 35.012 written in words and why
Was the Gold Rush a good or bad thing for the United States?
in what ways is climate controlled by the sun and the water cycle ?
When was World War I?