It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

What is 3.2 x 10^-4 m/h in centimeters per second? a) 8.889 × 10^−6 cm/s b) 8.889 × 10^−5 cm/s c) 1.152 × 10^−5 cm/s d) 1.152 × 10^−7 cm/s
What Is 89.519 Rounded To The Nearest Whole Number
What is the function of the verbal in the sentence? My goal is to skydive over the Grand Canyon. It is used as a noun. It is used as a verb. It is used as an ad
what is 12.09 and 9.88 rounded to the nearest hundreth
Besides making laws, what are some other jobs of the House of Representatives and senate?
Jon has $45.00.He plans to spend 4/5 of his money on sports equipment .How much will he spen .Show Work.
A stereo manufacturer makes three types of stereo systems, I, II, and III, with profits of $20, $30, and $40, respectively. No more than 100 type-I systems can
when a large animals eats a plant eater what does it get
Derive the equation of the parabola with a focus at (−5, 5) and a directrix of y = -1.
Sum of 3 numbers is 133. Third number is 3 times the first. Second number is 8 more than the first. What are the numbers?