hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

What two numbers added together give you 99.7Percent ?
Which is a factor of 6x2y 8x2 − 30y − 40? x − 4 3y 4 x2 4 3y − 5
Help me plz and thank you
Then at the bottom was the biggest line of all, which said: LADIES AND CHILDREN NOT ADMITTED. “There,” says he, “if that line don’t fetch them, I don’t know Ark
Opaque, translucent, and transparent are all terms used to describe what optical property? A. Ability to transmit light B. Streak C. Luster D. Color
1. Which of the following is NOT a true statement about disciplinary sanctions and transcripts? Suspensions and expulsions are the only disciplinary sanctions t
describe society and politics in the 13 english colonies during the mid-1700s
what is the estimate of 6,904
the newspaper has more than 30 pages and fewer than 40 pages the newspaper is divided into sections each section has exactly eight pages how many sections does
Which sentence uses correct capitalization? a. i told jilly and ryan to take a left at main street and then head south for two miles before hitting bolt avenue