Select the correct answer.
What helps the project team to identify the latest software build?
A.
defect
B.
version number
C.
test plan
D.
test environment
E.
hardware

Respuesta :

ianhulett
ianhulett ianhulett
  • 05-01-2021

Answer:

B version number

Explanation:

Answer Link

Otras preguntas

A water tanker filled up to 2/3 of its height is moving with a uniform speed. On certain application of the great, the water in Tank would : A move backwardsB
A ski starts from rest and slides down a 22 incline 75 m long. if the coefficient of friction is 0.090, what is the ski's speed at the base of the incline?
Help what’s the answer
Find the domian of the graphed function
match the stem and leaf plot to the correct set of data. A) 6, 5, 5, 1, 1, 1, 1, 1, 1, 6, 6, 6, 5, 5, 5 B) 15, 15, 16, 21, 21, 21, 35, 36 C) 1.5, 1.5, 1.6, 2.1
In a chess match, a win counts as 1 point, a draw counts as 0.5 point, and a loss counts as 0 points. After 21 games between the two players, the winner was 8 p
Bo bought a few items for $93.84, not including tax. If the tax rate was 7%, what was the total cost of these items, including tax?
It is easy to classify people into clear-cut racial categories. T or F?
Which number produces a rational number when added to 0.42? A. Pi B.0.2645751311... C.3/8 D. √3
Can someone help me with these 3 questions. (30 points)